Navigating Gateway 2: Detailed Design Requirements for High-Rise Buildings Under the Building Safety Act 2022
- Adem Chic
- Jul 8
- 2 min read
Updated: Jul 31
As the UK construction industry adapts to the Building Safety Act 2022, Gateway 2 is becoming a crucial milestone for interior designers and property developers. Understanding and preparing for Gateway 2 is vital to avoid costly delays and ensure compliance with high-rise building regulations.

What Is Gateway 2 Building Safety Act?
Gateway 2 is part of the Building Safety Act 2022, designed to ensure safety-critical details are resolved before construction begins. Developers must submit comprehensive, detailed designs to the Building Safety Regulator, covering methods, materials, and change management processes.
Key Requirements for Gateway 2 Approval
To secure approval, your submission must include:
•Detailed design plans with construction methods clearly outlined
•Complete specifications for all materials
•Safety compliance statements
•A robust change control plan
The Importance of Detailed Material Specifications
At Ademchic, we have spent over nine years mastering the delivery of comprehensive, detailed material specifications—covering every element from structural materials to finishes—even before tendering begins. Our meticulous approach ensures regulatory compliance and helps prevent costly redesigns and delays later in the project.
Navigating the Change Control Process
Changes post-approval are possible but strictly controlled under Gateway 2. Each change must undergo thorough review and re-approval. Ademchic recommends:
•Clearly documenting the initial design rationale
•Establishing a transparent change management workflow
•Using digital tools for tracking and approval
Common Pitfalls & How to Avoid Them
Avoid these frequent pitfalls to streamline your Gateway 2 process:
•Incomplete Specifications: Clearly detail every material and finish.
•Underestimating Documentation: Allocate adequate resources and time for thorough documentation.
•Poor Change Control: Implement robust processes to manage design amendments.
Ademchic’s proactive strategy involves early regulator engagement, meticulous planning, and comprehensive documentation from project inception.
Why Experience Matters: Ademchic’s Advantage
Having delivered detailed design documentation for over 130 projects and more than 2,500 residential units, Ademchic brings unparalleled expertise in navigating complex regulatory landscapes. Our proven approach ensures projects not only comply but also excel, reducing risks and enhancing outcomes.
Preparing for a New Standard in Design
Gateway 2 is a pivotal step towards safer, higher-quality high-rise buildings. Early preparation and detailed planning are key. With Ademchic’s deep expertise, you can confidently navigate these new regulations and deliver exceptional, compliant designs.